Design and physical evidence
Verification Plan
What should be checked before releasing an RF or IoT PCB? Review net connectivity, DRC, the complete RF path, approved impedance geometry, stackup, reference continuity, antenna keepout, power-noise risks, mixed-signal routing, DFM and DFA. Planned VNA measurements, antenna tuning, wireless functional testing and EMC testing are physical verification activities; they must not be presented as completed results without evidence.
- Confirm RF-chain connectivity, component orientation and interface placement
- Review controlled-impedance geometry against the approved stackup
- Inspect RF references, return transitions, connector grounding and antenna keepout
- Review switching loops, rail coupling, sensor paths and mixed-signal current flow
- Complete fabrication-data, DFM, DFA and assembly-data reviews
- Define prototype RF, wireless and pre-compliance test scope where required
This is a proposed verification plan. It is not evidence that RF measurements, antenna tuning, functional tests or EMC certification were completed.